CIVIL

    Pharma Vision is appointed by the principle to plan, control, organize and co-ordinate the project with the brief to manage the design and construction of the project from conception to completion. The principal engages the other consultants and the contractors directly, it is usual for the principal not engage a single head contractor, by engaging each party individually or subgroups, the principal retains control of the project, but communicates with all consultants and contractors via the project manager. This model is often used to deliver complex projects on a fast-track basis. A common variation of this method is break the design and construction phases into two parts call ‘package contracting’ method, so the principal separately engages design consultants and construction managers to manage the trade contractors. That means that the initial project manager is not responsible for the entire project but will be responsible for managing an individual trade contractor and its relevant design consultant until construction.

Project and Construction Management method is the best out of the following project delivery methods:

  • Basis of Design for loads on structure
  • Sub Structure and Super Structure Working Drawings
  • Structural Drawings
  • Equipment Foundation Drawings
  • Rain Water Drainage and Water Harvesting Scheme
  • Tender inquiry including item specifications and bill of quantities
  • Techno Commercial Analysis, Recommend Contractors
  • Verify Measurements and Certify Bills